Laserfiche WebLink
0811 <br />Preliminar Cost Estimate <br />Lomax Park Improvements <br />CITY OFLAPORTE PARKS & RECREATION DEPARTMENT <br />uoMAX PARK IMPROVEMENTS ' PRELIMINARY COST EST <br />Preliminary Cost Estimate from Pecan Park Pricing, Construction Manager at Risk, Guaranteed Maximum Price <br />Assume equivalent costs, with any cost increases to be covered by the contingency. <br />Pa zms <br />NOTES & <br />PRI FOR <br />difference from original. b­d <br />or, d m S�.p. <br />Revised <br />NOTES AND <br />Revised <br />ASSUMPTIONS <br />ESTIMATE, <br />E� 1,UIVALENT <br />pcip.ol <br />Preliminary <br />Preliminary <br />WO R K A i P N <br />Estimate <br />ASSUMPTIONS, 100 <br />REDUCE BUILDI�G <br />REDUCED <br />PARK <br />(FORMULAS) <br />100 BUILDING <br />(VALUES) <br />SIZE TO 1 00'X 60' <br />BUILDING SIZE <br />A. SITE <br />WORK <br />SITE WORK _ GRUBBING, GRADING, <br />assume one third of 1/33rd = cost per <br />1 <br />ELECTRICAL FOR PARKING LOT, ETC. <br />$ 1,239,795 <br />$ 50,000 <br />acre is $12,500 per acre, X 4 acres <br />$ 50,000 <br />little or no change in site work <br />$ 50,000 <br />assume 1/33rd = cost per acre, is <br />4 <br />SITE AMENITIES <br />assume removal of existing light poles <br />from Girl's softball ' install underground <br />8 <br />LOT LIGHTS AND PULLED WIRE <br />$ 35,650 <br />$ 10,000 <br />wiring for new parking lot. <br />$ 10,000 <br />no change <br />$ 10,000 <br />assumes irrigation, plant material for <br />9 <br />LANDSCAPING <br />add landscaping <br />$ 15,000 <br />entrance beds, etc. <br />$ 15,000 <br />no change <br />$ 15,000 <br />DEMOLITION 4 EXISTING BLDGS & ASBESTOS <br />Asbestos found in filor tile and mastic, <br />Old Lomax City Hall. Abatement and <br />11 <br />RE-PAINTING ARENA SUPPORT BEAMS <br />$ 50,000 <br />$50,000 <br />B. PLAYFIELDS <br />12 <br />BLEACHERS <br />assume equal cost, 4 sets 15 raw <br />Estimate of $60,000 (D. Earip) for <br />announcer's stand, per existing design <br />131 <br />PLAZA AND ANNOUNCERS STATION <br />$ 60 '000 <br />by Manning Engineenng <br />$ 60,000 <br />no change <br />$ 60,000 <br />C. PAVILIONIRESTROOM/CONCESSION <br />same size bldg. <br />6000 sq. ft. bldg. cost estimate <br />6000 sq. ft. bldg. cost estimate <br />15 <br />— metal building company <br />$ 73,468 <br />same <br />$ 73,468 <br />$ 73,468 <br />reduced by 33% <br />$ 48,489 <br />6000 sq.. ft. bldg. cost estimate <br />reduced by 1/4 (cost of crane still high <br />change, same res7r <br />171— <br />electrical <br />$ 30,700 <br />same <br />$ 30,700 <br />$ 30,700 <br />Ina <br />concession, mtg. room <br />$ 30,700 <br />Pa zms <br />