Laserfiche WebLink
0811 <br />Preliminary Cost Estimate <br />Lomax Park Improvements <br />Page 3 of 3 <br />NOTES & <br />PRICE FOR difference <br />from original. based Revised <br />Revised <br />EG"IJIVALEN T or, d ranges in pcip.ol S°.p. Preliminary NOTES AND <br />Preliminary ASSUMPTIONS, <br />ESTIMATE, <br />ofrojork <br />WORK A �- PE, N <br />(�.bje,,t to fldnrs, <br />changs) Estimate ASSUMPTIONS, 100' x <br />Estimate REDUCE BUILDING <br />REDUCED <br />PARK <br />(FORMULAS) 100' BUILDING <br />(VALUES) SIZE TO 1 00' X 60' <br />BUILDING SIZE <br />47 —doors $ 5,072 <br />$ 5,072 interior doors <br />$ <br />5,072 no change <br />$ 5,072 <br />48— installdoors $ 1,250 <br />$ 1,250 <br />$ <br />1,250 no change <br />$ 1,250 <br />49 —door hardware <br />$ 200 <br />$ <br />200 no change <br />$ 200 <br />assume 1 shower stall, dressing area <br />50 —shower stall $ 2,029 <br />$ 4,058 Per restroom per LPLSRA request <br />$ <br />4,058 no change <br />$ 4,058 <br />assume bollards at 6 doors instead of <br />51 —bollards at doors - 6ea. $ 4,125 <br />$ 8,250 3 <br />$ <br />8,250 no change <br />$ 8,250 <br />52 Turndown on west roof edge to block sun on Arena <br />$ 6,000 <br />$ <br />6,000 no change <br />$ 6,000 <br />Additional parking lot on west side of proposed <br />53 building (covered in site work estimate above) <br />Site work to improve drainage and useability of old <br />54 ballfield site (covered in site work estimate above) <br />Split rail fencing along "P" Street and Lomax School <br />assume 1,000 linear ft. @ $9.25 per <br />55 Road (in addition to landscaping) <br />$ 9,250 linear foot (LC13 contract price) <br />$ <br />9,250 no change <br />$ 9,250 <br />0 <br />smaller building, reduce savings by <br />56 BUILDING ERECTION <br />31.359) 1/4 <br />S 2 3519 2 5) <br />BUILD ANNOUNCER'S STAND (estimate provided <br />57 by Danny Earp, Oates Industries) <br />S I60000 ajo) <br />58 CONTINGENCY @ 20%, PER CITY ENGINEER <br />$ 187,791 <br />$ <br />179,519.10 <br />$ 158,083 <br />SUBTOTAL $ 1,126,745 <br />$ <br />1,077,114.60 <br />$ 948,496 <br />59 ARCHITECTURAL FEES @ 10% OF PRELIMINARY ESTIMATE ABOVE. <br />$ 93,895 <br />$ <br />89,759.55 <br />1 <br />$ 79,041 <br />1,166,874.16 <br />17 <br />Page 3 of 3 <br />