My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-22-12 Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Agenda packets 2010 to current
>
La Porte Development Corporation/4B
>
2012
>
10-22-12 Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 10:20:36 AM
Creation date
3/7/2025 1:16:49 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
10/22/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRELIMINARY ENGINEERING ESTIMATE FOR <br />DRAINAGE IMPROVEMENTS ALONG "D" STREET <br />CITY OF LA PORTE, TEXAS <br /> SECTION "A" - DRAINAGE <br />ITEMBIDUNIT <br />NO.ITEM DESCRIPTIONUNITQUANTITYPRICEAMOUNT <br />1Mobilization <br /> @_________________________________________________ <br /> _________________________________________________LS1.00$20,000.00$20,000.00 <br />Per LumpSum <br />210'x7' RCB including Clearing, Grubbing & Bedding <br /> @_________________________________________________ <br /> _________________________________________________LF330.00$870.00$287,100.00 <br />Per Linear Foot <br />3Earthwork Excavation for Fill Material <br />@_________________________________________________ <br /> _________________________________________________CY7,300.00$4.75$34,675.00 <br />Per Cubic Yard <br />4Type I Junction Box <br />@_________________________________________________ <br /> _________________________________________________EA1.00$15,000.00$15,000.00 <br />Per Each <br />5Type I Junction Box w/ Grate Inlet Top <br />@_________________________________________________ <br /> _________________________________________________EA2.00$20,000.00$40,000.00 <br />Per Each <br />6Storm Water Pollution Prevention <br />@_________________________________________________ <br /> _________________________________________________LS1.00$1,000.00$1,000.00 <br />Per Lump Sum <br /> <br /> SUBTOTAL SECTION "A" DRAINAGE$397,775.00 <br /> SUBTOTAL SECTION "A" SANITARY SEWER$397,775.00 <br />+15% CONTINGENCY$59,666.25 <br />TOTAL ESTIMATE FOR DRAINAGE IMPROVEMENTS$457,441.25 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.