Laserfiche WebLink
SECTION "B" - PARKING LOT <br />ITEMBIDUNIT <br />NO.ITEM DESCRIPTIONUNITQUANTITYPRICEAMOUNT <br />16" Reinforced Concrete Pavement <br /> @_________________________________________________ <br /> _________________________________________________SY1800.00$30.00$54,000.00 <br />Per Square Yard <br />26" Lime Stabilization (8% by weight) <br />@_________________________________________________ <br /> _________________________________________________SY1,926.00$3.75$7,222.50 <br />Per Square Yard <br />36" Dowel Curb <br />@_________________________________________________ <br /> _________________________________________________LF400.00$3.00$1,200.00 <br />Per Linear Foot <br />4Striping <br />@_________________________________________________ <br /> _________________________________________________LS1.00$5,000.00$5,000.00 <br />Per Lump Sum <br />5Storm Water Pollution Prevention <br />@_________________________________________________ <br /> _________________________________________________LS1.00$2,000.00$2,000.00 <br />Per Lump Sum <br /> <br /> SUBTOTAL SECTION "B" <br />$69,422.50 <br /> SUBTOTAL SECTION "B" PARKING LOT$69,422.50 <br />+15% CONTINGENCY$10,413.38 <br />TOTAL ESTIMATE FOR PARKING LOT$79,835.88 <br /> <br />