My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-22-13 Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
Agenda packets
>
La Porte Development Corporation/4B
>
2013
>
04-22-13 Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 10:47:05 AM
Creation date
3/7/2025 1:16:55 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/22/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
cataa q s t <br />retail census of not only who and what currently exist, but also will display the lack or under - <br />supplied retail nodes for La Porte. As part of this process we collected over 530 operators. <br />Next Steps <br />While we are definitely in the 'laying the groundwork' phase of the project we have still been <br />able to gather and start to begin some of the analytics on what we have. Logistically we are <br />updating maps (aerials, income, population, locator and trade area) to begin to see things from <br />a more dimensional perspective. <br />Over the next 2-3 weeks we will be able to begin the analytical phase of the project to develop <br />conclusions. Specifically, the Property Analysis for each selected area, Sales/Lease comps, Retail <br />Gap/Leakage Assessment, Marketing Phase, Competitive Nodes, Psychographic profile, <br />Firmographics and Summary of findings will be included in the Merchandising Plan Report. <br />Once the strategy has been set the Recruitment phase will begin. We are working to complete <br />as much as we can prior to ICSC RECon in May 2013. As we meet with potential tenants for La <br />Porte, Catalyst will update the city on any new prospects for La Porte. <br />I have attached a Gaant chart that list a bigger picture breakdown on next steps for La Porte and <br />Catalyst. We are excited about completing the Merchandising Plan for La Porte shortly. <br />If there is anything that we can do to help, please do not hesitate to contact us <br />Thank you, <br />to lyst <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.