Laserfiche WebLink
Preliminary Construction Cost Estimate <br />Proposed Truck Routes <br />April 3, 2011 <br />Qty Unit <br />Unit Cost <br />Cost <br />West M Street <br />Concrete Pavement <br />1442 SY <br />$7.00 <br />$10,095.56 <br />Remove Existing Pavement <br />36 Tan <br />$75.00 <br />$2,704.17 <br />Lime Stabilization <br />14 Ton <br />$145.00 <br />$2,091.22 <br />Fly Ash Stabilization <br />1442 SY <br />$36 .00 <br />$,9 <br />10 inch Rienforced Concrete Pavement <br />$66,&10.0.94 <br />Total <br />Aspahlt Pavement: <br />1442 <br />SY <br />$7.00 <br />$10,095.56 <br />Remove Existing Pavement <br />36 <br />Ton <br />$75.00 <br />$2,704.17 <br />Lime Stabilization <br />14 <br />Ton <br />$145.00 <br />$2,091.22 <br />Fly Ash Stabilization <br />811 <br />Ton <br />$30.00 <br />$24,337.50 <br />Limestone Base <br />105 <br />Ton <br />$75.00 <br />$7,909.69 <br />1.5 Inch HMAC <br />$47,138.13 <br />Subtotal <br />Maintenance (resurface every 7 years) <br />7 <br />EA <br />$7,909.69 <br />$55,367.81 <br />$102,505.94 <br />Total <br />West G Street <br />Concrete Pavement <br />1442 <br />SY <br />$7,00 <br />$10,095.56 <br />Remove Existing Pavement <br />36 <br />Ton <br />$75.00 <br />$2,704.17 <br />Lime Stabilization <br />14 <br />Ton <br />$145.00 <br />$2,091.22 <br />Fly Ash Stabilization <br />1442 <br />SY <br />$36 .00 <br />$,0. <br />10 inch Rienforced Concrete Pavement <br />$66,810.94 <br />Total <br />Aspahlt Pavement: <br />1442 <br />SY <br />$7.00 <br />$10,095.56 <br />Remove Existing Pavement <br />36 <br />Ton <br />$75.00 <br />$2,704.17 <br />Lime Stabilization <br />14 <br />Ton <br />$145.00 <br />$2,091.22 <br />Fly Ash Stabilization <br />811 <br />Ton <br />$30.00 <br />$24,337.50 <br />Limestone Base <br />105 <br />Ton <br />$75.00 <br />$7,909.69 <br />1.5 Inch HMAC <br />$47,138.13 <br />Subtotal <br />Maintenance (resurface every 7 years) <br />7 <br />EA <br />$7,909.69 <br />$55,367,81 <br />$102,505.94 <br />Total <br />