Laserfiche WebLink
West F Street <br />Concrete Pavement : <br />Remove Existing Pavement <br />1442 <br />SY <br />$7.00 <br />$10,095.56 <br />Lime Stabilization <br />36 ' <br />Ton <br />$75.00 <br />$2,704.17 <br />Fly Ash Stabilization <br />14 <br />Ton <br />$145.00 <br />$2,091.22 <br />10 Inch Rienforced Concrete Pavement <br />1442 <br />SY <br />$36.00 <br />$51,920.00 <br />Total <br />$66,810.94 <br />Aspahlt Pavement: <br />Remove Existing Pavement <br />1442 <br />SY <br />$7.00 <br />$10,095.56 <br />Lime Stabilization <br />36 <br />Ton <br />$75.00 <br />$2,704.17 <br />Fly Ash Stabilization <br />14 <br />Ton <br />$145.00 <br />$2,091.22 <br />Limestone Base <br />811 <br />Ton <br />. $30.00 <br />$24,337.50 <br />1.5 inch NMAC <br />105 <br />Ton <br />$75.00 <br />$7,909.69 <br />Subtotal <br />$47,138.13 <br />Maintenance (resurface every 7 years) <br />7 <br />EA <br />$7,909.69 <br />$55,367.81 <br />Tota 1 <br />$102,505.94 <br />South 14th Street rnprovernents <br />Concrete Pavement: <br />Site Preparation <br />1.82 <br />AC <br />$2,500.00 <br />$4,545.45 <br />Roadway Excavation <br />3129 <br />CY <br />$2.50 <br />$7,822.22 <br />Lime Stabilization <br />78 <br />Ton <br />$75.00 <br />$5,866.67 <br />Fly Ash Stabilization <br />31 <br />Ton <br />$145.00 <br />$4,536.89 <br />10 inch Rienforced Concrete Pavement <br />3227 <br />SY <br />$36.00 <br />$116,160.00 <br />Total <br />$138;931.23 <br />Aspahlt Pavement: <br />Site Preparation <br />1.82 <br />AC <br />$2,500.00 <br />$4,545,45 <br />Lime Stabilization <br />81 <br />Ton <br />$75.00 <br />$6,050.00 <br />Fly Ash Stabilization <br />32 <br />Ton <br />$145.00 <br />$4,678.67 <br />Limestone Base <br />1915 <br />Ton <br />$30.00 <br />$54,450.00 <br />1.5 Inch HMAC <br />236 <br />Ton <br />$75.00 <br />$17,696.25 <br />Subtotal <br />$97,420.37 <br />Maintenance (resurface every 7 years) <br />7 <br />EA <br />$17,696.25 <br />$123,873.75 <br />Total <br />$211,294.12 <br />