Laserfiche WebLink
West E Street <br />Concrete Pavement <br />Remove Existing Pavement <br />1442 <br />SY <br />$7.00 <br />$10,095.56 <br />Lime Stabilization <br />36 <br />Ton <br />$75.00 <br />$2,704.17 <br />Fly Ash Stabilization <br />14 <br />Ton <br />$145.00 <br />$2,091.22 <br />10 Inch Rienforced Concrete Pavement <br />1442 <br />SY <br />$36.00 <br />$51.,920.00 <br />Total <br />$66,810.94 <br />Aspahlt Pavement: <br />Remove Existing Pavement <br />1442 <br />SY <br />$7.00 <br />$10,095.56 <br />Lime Stabilization <br />36 <br />Ton <br />$75.00 <br />$2,704.17 <br />Fly Ash Stabilization <br />14 <br />Ton <br />$145.00 <br />$2,091.22 <br />Limestone Base <br />811 <br />Ton <br />$30.00 <br />$24,337.50 <br />1.5 Inch HMAC <br />105 <br />Ton <br />$75.00 <br />$7,909.69 <br />Subtotal <br />$47,138.13 <br />Maintenance (resurface every 7 years) <br />7 <br />EA <br />$7,909.69 <br />$55,367.81 <br />Total <br />$102,505.94 <br />West D Street <br />Concrete Pavement : <br />Remove Existing Pavement <br />1442 <br />SY <br />$7.00 <br />$10,095.56 <br />Lime Stabilization <br />36 <br />Ton <br />$75.00 <br />$2,704.17 <br />Fly Ash Stabilization <br />14 <br />Ton <br />$145.00 <br />$2,091.22 <br />10 Inch Rienforced Concrete Pavement <br />1442 <br />SY <br />$36.00 <br />$51,920,00 <br />Total <br />$66,810.94 <br />Aspahit Pavement: <br />Remove Existing Pavement <br />1442 <br />SY <br />$7.00 <br />$10,095.56 <br />Lime Stabilization <br />36 <br />Ton <br />$75.00 <br />$2,704.17 <br />Fly Ash Stabilization <br />14 <br />Ton <br />$145.00 <br />$2,091.22 <br />Limestone Base <br />811 <br />Ton <br />$30.00 <br />$24,337,50 <br />1.5 Inch HMAC <br />105 <br />Ton <br />$75.00 <br />$7,909.69 <br />S u btota l <br />$47,138.13 <br />Maintenance (resurface every 7 years) <br />7 <br />EA <br />$7,909.69 <br />$55,367.81 <br />Total <br />$102,505.94 <br />