Laserfiche WebLink
B. Site issues beyond the control of RFL. <br />C. Damage to existing improvements. <br />D. Protection of existing utilities, landscaping, and improvements. <br />E. If required per geotech report, footing, piers, and/or select fill labor and materials to be <br />provided by others. <br />F. Excavation and backfill. <br />CLIENT'S SCOPE OF WORK <br />TURNKEY INSTALLATION OF RESTROOM BUILDING WITH ATTACHED SLAB <br />1. SURVEY STAKES: <br />Provide ten foot offset stakes and locate front corners of building, existing utilities, and <br />inverts within the area of construction. Locate and mark final slab elevation. <br />2. SUBGRADE PAD: <br />Preparing the site is fairly simple. Detailed instructions to prepare the building site are <br />as follows: <br />2.1. Excavate down ten inches below the finish floor elevation (the slab is eight inches <br />thick on top of a two inch sand bed). <br />2.2. If soils are poor, it may be necessary to import six inches of Class II base rock, <br />and pour for a footing and/or piers. (This is not necessary if native soils will <br />compact) <br />2.3. Compact to 95%, or to local code requirement. <br />2.4. Compact one foot over in all directions (over build). <br />2.5. Supply approximately five cubic yards of clean sand, on side of site, for fine <br />grading. <br />2.6. Excavate and backfill trenches up to and within building pad for RFL supplied <br />underground utility service kits. <br />2.7. Provide water and inspection for RFL supplied underground sewer kit. <br />2.8. Depending on weather, all irrigation should be turned off prior to delivery to allow <br />the surrounding soils to dry and bear the weight of the truck and crane. <br />2.9. Check comer locations against plans for proper sizing. <br />2.10. Verify finish floor elevation for concrete slab (shipped fully attached to the <br />building.) <br />2.11. Excavate one foot perimeter footing if required by local code to specified depth. <br />3. SITE ACCESS AND STORAGE: <br />Provide suitable safe clear access to allow a crane (up to 110 tons), and the building on <br />a semi -trailer (up to 40 tons) to reach site (14' width, 70' length, and 14' in height). If <br />path to site is over existing utilities, sidewalks, or other damageable areas, proper <br />marking, plating or other appropriate protection must be provided by CLIENT. CLIENT is <br />responsible for removing any overhead obstructions (i.e. power lines, trees). This <br />proposal provides for a 110 ton crane with access to within 25' of the building pad. The <br />initial initial Page 2 of 8 <br />1707 Colt Circle, Marble Falls, Texas 78654 0 Phone; 512.222.5454 0 wwvv.restroomfacilities.com <br />