My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-11-16 Martin L. King Splash Park
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Public Works
>
Martin L. King Splash Park
>
04-11-16 Martin L. King Splash Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 11:42:05 AM
Creation date
3/7/2025 1:34:04 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Contracts/Leases/Agreements
Date
4/11/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
proposal is based on four (4) hours of crane time. If access is limited a larger crane may <br />be required. All additional crane costs shall be borne by the CLIENT. A direct route to <br />the project site is assumed. Should routes be altered due to road closures or <br />restrictions, additional fees may apply. <br />4. UTILITIES: <br />Bring water, sewer, and power (if applicable) utilities into point of connection Christy <br />boxes (supplied by RFL), within six feet of the building line at the location shown on our <br />plan. <br />4.1. Water: RFL will furnish and install a water point of connection (isolation valve), <br />from mechanical chase to a Christy box six feet from the building line. CLIENT <br />must connect service to valve. <br />4.2. Sewer: RFL will furnish and install a sewer point of connection from mechanical <br />chase to a Christy box six feet from the building line. CLIENT must connect <br />service. <br />4.3. Electrical: (when this option is chosen) RFL will furnish and install a PVC conduit <br />and a Christy box to the point of connection six feet from the building line. <br />CLIENT to pull the electrical service line through the conduit and connect to the <br />main panel lugs inside the building. All electrical inside the building will be <br />furnished and installed by RFL, except as noted above in exclusions. <br />4.4. If the utilities are not available when we depart the site, testing and minor leaks <br />will be the responsibility of the CLIENT. <br />4.5. A minimum 1'/2" line with 25 gpm at 60 psi pressure minimum is required to <br />ensure that water closets will operate as designed. If this is not available an <br />auxiliary holding tank may be required. <br />5. SPECIAL CONDITIONS AND COSTS: <br />If specifications by owner require any testing or special inspections, costs, if any, shall <br />be borne by CLIENT. <br />6. PERMITS AND FEES: <br />All building permits and fees shall be borne by CLIENT. <br />7. INSPECTIONS: <br />It is very important that the CLIENT understand that our costs are based upon fast track <br />construction and that delays for inspection are an impediment to the timely completion of <br />the project. We seek the full cooperation of the CLIENT and local building officials or <br />project inspectors in accomplishing this end. We require that all inspections be <br />scheduled with adequate notice to ensure that the underground plumbing and electrical <br />work is approved prior to placement of building. We require that final inspection and <br />acceptance by owner and building officials be performed immediately following RFL's <br />completion of installation. We also require final inspection and acceptance immediately <br />following RFL's conclusion of any correction items. <br />Af�lnitial Initial Page 3 of 8 <br />{( 1707 Colt Circle, Marble Falls, Texas 78654 0 Phone: 512.222.5454- 0 4v mrestroornfaciIities.corn <br />
The URL can be used to link to this page
Your browser does not support the video tag.