Laserfiche WebLink
• <br />•I. INTRODUCTION <br />A. History - June 9, 1947 - deeded to the City of La Porte <br />B. Four (4) FBO"s - National Guard <br />C. Reliever designation <br />II. PHYSICAL FACILITIES <br />A. Pre - 1983 <br />1. Runways/Taxiways <br />2. 300 Acres <br />3. Lights; NDB <br />B. FAA Improvements <br />1. Planning Grant - $36,000 - Master Plan <br />2. Phase I - FAA $ 640,018.22 <br />City 93,072.87 <br />TOTAL $ 733,091.09 <br />65 Tie downs; access road/parking; 1/2 perimeter fence; <br />water line/hydrant; connector taxiways (4) <br />3• <br />Phase II - FAA <br />City <br />$ 474,715.32 <br />54,582.15 <br />TOTAL <br />4. <br />(Incomplete) $ 529,297.47 <br />21 tie downs; drainage; <br />complete perimeter fence; runway/taxiway lights; relocate <br />beacon and wind cone; purchase land in clear zone <br />(underway) <br />Phase III - FAA $ 440,000.00 <br />City 59,618.12 <br />$ 499,618.12 <br />5. <br />23 tie-downs: drainage; three (3) T-hangar sites with <br />taxiway, access road and parking <br />GRAND TOTAL-FAA $ 1,554,733.54 <br />City 207,273.14 <br />$1,762,006.68 <br />