<br />y p>/IATrO~V DEPARTMENT OF TRANSPORTATION
<br />/~,:-; ~~~~ FEDERAL AVIATION ADMINISTRATION
<br />~: ~_~~~~* Southwest Region
<br />,~ ~~. P. 0. Box 1689
<br />~\,~osG~~S,,OF P`r~~ Fort Worth, Texas 76101
<br />DETERMINATION OF NO HAZARD TO AIR NAVIGATION
<br />IN REPLY REFER TO
<br />AERONAUTICAL STUDY
<br />No. 77-ASW-985-OE
<br />Novamont Corporation
<br />o Attn: Mr. Roland Messori
<br />A Lafayette Bldg 405C
<br />y 701 N. Post Oak Road
<br />Houston, Texas 77024
<br />DESCRIPTION
<br />CONSTRUCTION
<br />PROPOSED Flare Tower
<br />CONSTRUCTION LOCATION
<br />PLACE NAME
<br />
<br />LATITUDE LONGITUDE
<br />29°42'24" 95°04'41"
<br />HEIGHT IIN F[[r)
<br />ABOVE 6ROUN0 ABOV[ M S L
<br />370 402
<br />An nernnautical study of the proposed construction described above has been completed under the provisions of Part 7? of the
<br />F'edr•ral Aviation Regulations. Based on the study it is found that the construction would have•no substantial adverse effecj
<br />nn the safe and efficient utilization of the navigable airspace by aircraft or on the operation of air navigation facilities. There-
<br />fore, pursuant to the authority delegated to me, it is hereby determined that the construction would not be a hazard to air navi-
<br />~ration provided the following conditions are met:
<br />Cnr~!irinns: The structure should be marked and lighted in accordance with Chapters
<br />3 and 5 in FAA Advisory Circular AC 70/7460-1E, Obstruction Marking and Lighting,
<br />which is available free of charge from the Department of Transportation,
<br />Publications Section TAD 443.1, 400 7th Street, S.W. Washington D.C. 20590.
<br />~~,prl~~uu~nl.ai notice of construction is required any time the project is abandoned (use the enclosed FAA form), or
<br />XXX' 1r least 48 hours before the start of construction (use the enclosed FAA form).
<br />~X) '+tilhin five days after the construction reaches its greatest height (use the enclosed FAA form).
<br />) ;. o, required.
<br />I t„•.. drtermination expires on April 9, 1979 unless:
<br />{n1 r:xtended, revised or terminat~ - e3 by tF~e issuing office;
<br />ii,) ihr.~ construction is subject to the licensing authority of the Federal Communications Commission and an application
<br />for r, r~nnstruction permit is made to the FCC on or before the above expiration date. In such case the determination
<br />r•xpirF~~ on the date prescribed by the FCC for completion of construction, or on the date the FCC denies the application.
<br />i:ir; decr:rrninntion is subject to review if an interested party files a petition on or before September 29, 1977 In the
<br />a~vrnt a p~•t i, ion for review is filed, it should be submitted in triplicate to the Chief, Airspace struction an irports ranch,
<br />,1'f' '?~,, 1'erieral Aviation Administration, Washington, I).C. 20590, and contain a full statement of the basis. upon which it is
<br />r~r,:1
<br />'T'hi•: ti: r~~rrnination becomes final on Or•t-nhar 4 ~ 1977 unless a petition for review is timely filed, in which case
<br />t•. -~rtcr~uination will not become final pending disposition of the petition. Interested parties will be notified of the grant of
<br />,~~ .~~,iew.
<br />1n .,.:noun! of the study findings, aeronautical objections, if •any, re~~tt~s~tared with the FAA during the study, and the basis for
<br />{h,~ f'A:1'•; dr•ci5ion in this matter will be found on th4[~~Q7gjQp~,gpdx~Cx reverse of this page.
<br />,1 u•+ s~ru..u,re is subject to the licensing authority of the FCC, a copy of this determination will be sent to that Agency.
<br />~'
<br /><~~~"~' ~ Chief, Airspace and Procedures Branch
<br />~i GNFf~ ~ ~ - TITLE
<br />ISUF~~ IN
<br />Fort Worth, Texas
<br />oN August 30, 1977
<br />~ ~
<br />FAA Form ~a6o.9 fa-~tl SW OP-1 (12/76) Obsoletes Previous Edition