Laserfiche WebLink
• • <br />9. The City Engineer presented the following estimated <br />cost for the construction of curb and gutter on <br />Second S t ree t <br />Curb and Gutter - -'~est Side of Block 400 <br />151' Property Owners @ 2.25 ~ 339.75 <br />15' City @ 2.25 33.75 <br /> 373.50 <br />Curb and Gutter - East Side of Block 400 <br />400' Property Owners ~ 2.25 900.00 <br />15' City @ 2.25 33.75 <br /> 933.75 <br />Street Paving - Block 400 <br />Material 1,691.00 <br />labor 359.00 <br /> 2,050.00 <br />Intersection <br />Curb and Gutter - City 230.00 <br />Street Paving 220.00 <br />450.00 <br />Curb and Gutter - Block 300 <br />236' Property Owners @ 2.25 531.00 <br />Street Paving - Block 300 <br />Materials 750.00 <br />Labor 310.00 <br />1,060.00 <br />Overall Cost <br />City X3,637.50 <br />Property Owners 1,770.75 <br />Total Cost $5,398.25 <br />The City Clerk was instructed to write each property <br />owner requesting that his portion of the money be <br />placed in Escrow or that he sign a contract and <br />material lien for same. Further that she be authorized <br />to allow Nr. Jean Elltott the City's cost on his <br />drain pipe. <br />+ + + <br />10. The City Engineer presented a bid of $700. from <br />Hamilton ~~onstruction Company for the cCearing of <br />"F", "G", and "H" Streets. Commissioner Osburn <br />made a motion, seconded by Commissioner Compton <br />That the City Engineer secure another bid, and that <br />he be authorized to accept the best of the two. <br />Further that he get the cost of opening the streets <br />further North. Motion carried. <br />+ + + <br />