Laserfiche WebLink
• • <br />5. Commissioner Compton made a motion, seconded by <br />Commissioner Shepherd that the City Engineer prepare <br />for the next meeting, an estimate of cost for construct- <br />ing the Segmented Circle at the Airport. Motion carried. <br />+ + + <br />6. The Commission had considerable discussion on a proposed <br />Mobil Home Ordinance and a proposed Sign and Billboard <br />Ordinance. Action was tabled for further study. <br />+ + + <br />7. The City Engineer was instructed to draw plans for <br />extendtng sewer lines under Polk Street, to serve the <br />North Side. <br />+ + + <br />8, Commissioner Stabs made a motion, seconded by Commissioner <br />Compton and carried that the following Accounts Payable <br />be approved: <br />Mustang Tractor Company ,704.47 <br />Machine Records, Inc. 996.80 <br />Utility Supply Company 289.97 <br />Dixie Chemical Company 132.00 <br />Knox Ask ins 280.00 <br />Unistrut Wulf, lnc. 350.15 <br />Conroe Creosoting Company 613.82 <br />~~holesale t lectric Co. 978.77 <br />+ + + <br />9. A motion was mad a by Commissioner Stubs, and seconded <br />by Commissioner Shepherd that Cummins, Reed and Clements <br />be authorized to negotiate with Moore & Moore, low bidder <br />for the construction of the Library, Civic Center and <br />additions to the Jaii. Motion carried. <br />+ + + <br />90. Commissioner Compton made a motion, seconded by <br />Commissioner Shepherd and carried that the following <br />Purchase Orders be approved: <br />4839 Goodrich Tire & Rubber $296.72 <br />4846 Utility ~upply Company 538.00 <br />4837 Armco Steel Corporation 220.50 <br />4818 W. S. Dickey Mfg. (1200'-8" Clay Pipe) <br />+ + + <br />