Laserfiche WebLink
<br /> <br />_n <br />~• <br /> <br />Page Two - City of La Porte - South Side Sanitary Sewers, Job No. 74-1132 <br />McKey Construction ~ Equipment Rentals, Inc. - Estimate 5 <br />em <br />No. <br />Item <br />uantit <br />Unit <br />Unit Price <br />Total <br /> <br />7. l5" V.C. Sanitary Sewer, <br /> R.G. Joints 8 - 10' cut <br /> Com lete in lace 945 L.F. 11.70 11,056.50 <br />8. 2i" V.C. Sanitary Sewer, <br /> R.G. Joints 8 - 10' cut <br /> Com lete in lace 150 L.F. 18.63 2 794.50 <br />9. 21" V.C. Sanitary Sewer, <br /> R.G. Joints 10 - 12' cut <br /> Com lete in lace 659 L.F. 26.86 17 700.74 <br />10. 8" C.I. Sanitary Sewer Pipe, <br /> AWWA Class 150 0 - 6' cut <br /> Com lete in lace Deleted L.F. 13.57 D E L E T E D <br />11. 8" C.I. Sanitary Sewer Pipe, <br /> AWWA Class 150 6 - 8' cut <br /> Com lete in lace Deleted L.F. i4.35 D E L E T E D <br />12. Sanitary Sewer Manhole <br /> Com lete in face 34 Each 400.00 13 600.00 <br />13. Extra Depth for Sanitary <br /> Sewer Manhole in excess Vert <br /> of 8 feet 30.35 Feet 40.00 1214.00 <br />14. 8" V.C. Sanitary Sewer, <br />* R.G. Joints by augered <br /> const. Com lete in lace Deleted L.P. 16.00 D E L E T E D <br />14a 8" PVC Sanitary Sewer, <br /> R.G. Joints by tunnel <br /> const. in 12" steel <br /> casin Com lete i~n lace 322 L.P. 40.00 12 880.00 <br />15. 8" Cleanouts, Complete <br /> in lace 13 Each 75.00 975.00 <br />16. Sanitary Sewer Creek <br /> Crossing to include pipe <br /> supports, 8" steel pipe and <br /> appurtenances f1^om Sta i9fi00 <br /> to lift Sta., Complete ~n Lump <br /> lace see sheets 3~d~~12 ~ ~ 100 5 17 000.00 17 000.00 <br /> <br />