Laserfiche WebLink
BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTING ENGINEERS <br />• 1107 FLEETWOOD DRIVE - BAYTOWN. TEXAS 77520 - PHONE (713) 42278213 <br />April 12, 1976 <br />Honorable Mayor Pro Tem <br />and City Commission <br />City of Ld Porte <br />Post Office Box 1115 <br />La Porte, Texas 77571 <br />FINAL ESTIMATE - 16TH STREET WATER MAIN <br />Although the construction of this job was completed some time <br />ago, the Contractor has been very slow in doing the cleanup work._ <br />This has now been finished to our satisfaction, and we recommend <br />• that final payment be made. <br />The cost of the original contract was overrun by $1,231.14 because <br />of there being an 8" gate valve added to the contract at $300.00, <br />and five fire hydrants which required extentions to raise them to <br />the proper elevation at a total cost of $931.14. The water line had <br />to be placed deeper than anticipated at some locations because of <br />conflicts with gas lines and telephone cables. This caused the <br />standard 4-foot bury fire hydrant to be too short. <br />The final contract cost is then $53,381.14. Deducting previous <br />payments of $44,505.00 makes the final estimate amount $8,876.14. <br />r <br />WcmAes <br />P. Hutcheson, P.E. <br />e President <br />JPH/dle <br />0 <br />