My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1976-04-19 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1976
>
1976-04-19 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:20:58 AM
Creation date
3/21/2025 1:32:48 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
4/19/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULT1NO ENQIN[ERS <br />1107 FLEETWOOD DRIVE - BAYTOWN. TEXAS 77520 - PHONE (717) 422•5217 <br />lavri1 12, 1976 <br />ESTIMATE NUMBER: Final <br />PROJECT: City of. La Porte - 16th Street Water Main•- Job No. 75-1213 <br />CONTRACTOR: Rogers Underground Utilities, Inc. <br />AMOUNT OF CONTRACT: $52,150.00 CONSTRUCTION TIME: 60 Working Days <br />Item <br />No. <br />Item <br />ity <br />Unit <br />Unit Price <br />Total <br />1. <br />16" Class 150 Asbestos -Cement <br />Water Line, Complete in place <br />17 <br />L.F. <br />20.00 <br />340.00 <br />2. <br />12" Class 150 Asbestos -Cement <br />Water Line, Complete in place <br />17 <br />L.P. <br />15.00 <br />255.00 <br />3. <br />8" Class 150 Asbestos -Cement <br />,• <br />�: <br />I -later Line, Complete in place <br />4,620 <br />L.F. <br />6.00 <br />30,030.00 <br />4. <br />6" Class 150 Asbestos -Cement <br />Water Line, Complete in place <br />150 <br />L.F. <br />5.00 <br />750.00 <br />5. <br />8" x 8" x 6" C. I. Tee, <br />Complete in place <br />15 <br />Each <br />150.00 <br />2,250.00 <br />6.. <br />16" Horizontal Gate Valve <br />; <br />w/Valve Boxes, Complete in <br />lace <br />1 <br />Each <br />3,000.00 <br />3,000.00 <br />7. <br />1211 Gate Valve w/Valve Box, <br />Complete in place <br />1 <br />Each <br />700.00 <br />700.00 <br />8. <br />8" Gate Valve w/Valve Box, `. <br />Complete in place <br />l <br />Each <br />300.00 <br />300.00 <br />9. <br />6" Gate Valve w/Valve Box, <br />Complete in place <br />15; <br />Each <br />200.00 <br />3,000.00 <br />.10. <br />Fire Hydrant, 4' Bury,.with ' <br />"Hydrolok" Connector, <br />Com lete in place <br />15 <br />Each <br />400.00 <br />6,000.00 <br />11. <br />8" x 8" Tapping Sleeve and " <br />Valve w/Valve Box, <br />Complete in place <br />1. <br />Eachl <br />900.00 <br />900.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.