My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1976-08-16 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1976
>
1976-08-16 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:52 PM
Creation date
3/21/2025 1:32:59 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/16/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />• Regular Meeting 8/16/76 4 <br />4. PUBLIC HEARING - PUBLIC LAW 92-500 - SANITARY SEWER (CONTINUED) <br />Mr. Smith then asked if the proposed Sewage Treatment Plant <br />Expansion has been planned and sized to accommodate Spenwick <br />Place M.U.D., since Spenwick lies within the extra-territorial <br />jurisdiction of La Porte? <br />Mr. Corbin answered that the proposed expansion has been sized <br />to include Spenwick Place M.U.D. as well as other neighboring <br />entities. <br />Mr. Love asked if the proposed effluent will enter Clear Lake? <br />Mr. Corbin answered that the proposed effluent will enter <br />Galveston Bay and not Clear Lake. <br />Mr. Love then asked if the proposed La Porte Sewage Treatment <br />Plant Expansion can be modified in the future to provide for <br />tertiary treatment as is now required for effluent entering <br />the Clear Lake? <br />Mr. Corbin answered that the proposed expansion can easily be <br />modified to provide for a tertiary process. <br />• Mr. Smith asked where septic tank effluent from Spenwick Place <br />M.U.D. is discharged? <br />Mr. Corbin replied that some of the wastewater effluent from <br />the septic tanks in Spenwick eventually probably discharge to <br />Big Island Slough. <br />Mr. Smith asked if La Porte has the responsibility to replace the <br />septic tank system in Spenwick with a sewer collection system, <br />thereby eliminating the discharge to Big Island Slough? <br />Mayor Meza answered that he thinks Spenwick Place M.U.D. has a <br />bond program set up to construct a water and sanitary sewer system. <br />Mr. Busch confirmed Mayor Meza's statement by saying that La Porte <br />has entered into an agreement with Spenwick to furnish water and <br />sanitary sewer service after their distribution and collection <br />systems have been completed. This service will be rendered for a <br />set fee to be established at a later date. <br />With no one else present desiring to give testimony, the public <br />hearing was declared closed at 7:50 P.M. <br />• + + + <br />
The URL can be used to link to this page
Your browser does not support the video tag.