Laserfiche WebLink
<br /> f . ';: <br /> Page T~o - City of La 4IJte - Construction of Fairmont~rk Recreational Facilities <br /> ~ Chatham Construction Com y - Estimate Ho. 4 <br /> , <br /> i <br /> .. J <br /> No. Item I Quanti t~l ~ni ~r Unit Price Total <br /> 10. Water Service, 2" PVC <br /> Pipe and Tap to main, <br /> tomplete in place 390 l.F. 1.58 616.20 <br /> . . 1l. Sanitary Sewer Service, <br /> ~" PVC Pipe and Manhole Tap 440 4.25 1,870.00 <br /> tomplete in place L. P. <br /> I <br /> . <br /> 12. Limestone Parking Lot, 6" <br /> Compacted Thickness <br /> including Lime Stabiliza- 99% of <br /> tion of Subgrade, Complete <br /> in place 4,700 S.Y. 6.81 31,686.93 <br /> 13. Base Sets, including three <br /> Field Bases and Home Plate, ^) <br /> as specified on the draw- <br /> inQs, Complete in place - 0 - Each 401.40 - 0 - <br /> I - <br /> 14. I Portable Pitching Mound - 0 - I - 0 - <br /> . ,as speci fi ed on drawi ngs Each 643.50 <br /> I <br /> 15. Spectator Bleachers as <br /> specified on drawings, <br /> complete in place - 0 - Each 741.75 - 0 - <br /> 16. Asphalt Surface Drive <br /> including lime stabiliza- <br /> tion of subgrade, 8" <br /> cement stabilized shell <br /> base and 1-1/2 thick <br /> asphalt concrete surface, 95% of <br /> Complete in place 580 S.Y. 7.81 4,303.31 <br /> 17. Break out existing curb <br /> and construct concrete <br /> ramps and curb returns at <br /> 3 locations, including <br /> lime stabi1itation of <br /> subgrade, Complete in Lump <br /> place All Sum 2,400.00 2,400.00 <br /> 18.1 Project S1gn as shown on - 0 -I Each <br /> plans, Complete in place 2,112.00 - 0 - <br /> - <br /> TOTAL WORK COMPLETED $159,691.64 <br /> " <br /> MATERIAL ON HAND , - <br /> l- <br /> . Spectator Bleachers @ Invoice Price ............. ............ 4,040.00 <br /> TOTAL WORK PLUS MATERIAL ON HAND ...... $163,731.64 <br /> -...-... ,. . . <br />