My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1978-09-20 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1970's
>
1978
>
1978-09-20 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:53 PM
Creation date
3/21/2025 1:34:49 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
9/20/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />~J <br />Honorable J. J. Meza, Mayor <br />Page Tt~o <br /> <br />September 18, 1978; <br />entire life of the system. High and low pressure sensing shutdown <br />devices are installed at alI of our pump stations to prevent or detect <br />any ruptures. Block valves caill be placed at readily accessible points <br />to give controls throughout the system. <br />A summary of the tests and inspections performed before, during and <br />After the construction of a new pipeline system is tabulated below: <br />1. A chemical ladle analysis is requested from the pipe <br />mill of each heat of steel used in filling an order by <br />Dow, The analysis so determined shall conform to the <br />requirements specified in Par. 3.1 of the American <br />Petroleum Institute, Spec. 5 LX. <br />• <br />2. The tensile properties of the line pipe will canfarm <br />to the tensile requirements specified in Table 4•. 1, <br />APT Sr~c. 5 LX. <br />3. Longitudinal, transverse and weld tensile tests (which <br />conform to the requirements of Paragraphs 4.6, 4.7 and 4.8 <br />of the API Spec. 5 LX and ASTM A-370, "r:echanic.al Testing <br />of Steel Products, Supplement II, Steel Tubular Products") <br />are performed at the pipe mill on specimens front each lot <br />of 100 lengths of pipe. <br />4. Flattening tests which conform to Paz'agrapii 4.14 of the <br />API, Spec. 5 LX are made on the crop ends cut from each <br />length of pipe produced at the mill. <br />5. A weld ductility test is performed at the pipe mill on <br />specimens cut from each lot of I00 lengths, and the test <br />must conform to Paragraph 4.20 of the API, Spec. 5 LX. <br />6. The weld seam of each length of pipe is nan-destructively <br />inspected for cracks by the use of ultrasonic or electro- <br />magnetic equipment which conforms to the inspection <br />standards set forth in Paragraphs 7.10 - ?.13 of .the API, <br />Spec. 5 LX. <br />u <br />7. Each length of pipe will withstand, without leakage, a mill <br />inspection hydrostatic test to at least a pressure <br />of 2732 psi. and will be held for nat less than 5 seconds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.