My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1980-06-30 Special Called Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1980
>
1980-06-30 Special Called Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:55 PM
Creation date
3/21/2025 1:36:02 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/30/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' f <br />Material passing the No. 40 sieve shall be known as "Soil Binder" <br />• and shall meet the following requirements when prepared in accord- <br />ance with Test Method Tex-101-E procedure: <br />The liquid limit shall not exceed .40 <br />The plasticity index shall not exceed .12 <br />Tolerances: The limits establishing reasonably close conformity <br />with the specified gradation and plasticity index are defined by <br />the following: <br />'The City may accept the material, providing not more than 2 <br />out of 10 consecutive gradation tests performed are outside the <br />specified limit on any individual or combination of sieves by no <br />more than S% and where no two consecutive tests are outside the <br />specified limit. <br />The City may accept the material providing not more than 2 <br />out of 10 consecutive plasticity index samples tested are outside <br />the specified limit by no more than 2 points and where no two con- <br />secutive tests are outside the specified .limit. <br />Under the terms as stated in the specifications of the Contract; <br />and at his (its or their) own proper cost and expense to furnish <br />all the materials, supplies, machinery, equipment, tools, super- <br />intendence, labor, insurance, and other accessories and services <br />necessary in accordance with the conditions and prices stated in <br />• the Proposal and specifications of the Contract. The specificat- <br />ions and contract documents therefore as prepared by the City of <br />La Porte, all of which are made a part hereof and collectively <br />evidence and constitute the contract. <br />The SUPPLIER hereby agrees to supply herein described mat- <br />erial no later than ten (10)days after contract has been awarded. <br />The OWNER-agrees to pay the SUPPLIER in current funds for <br />the performance of the contract, subject to additions and deduc- <br />tions, as provided in the specifications of the Contract, and to <br />make payments on account thereof as provided in the Specifications. <br />C~ <br />(11) <br />
The URL can be used to link to this page
Your browser does not support the video tag.