Laserfiche WebLink
- ~ ~ <br />• Spray apply one full coat of Ceilcote 251 FG to all seams to floor and <br />up 18" on wall, Lay in 4" cloth and roll in so as to absorb the applied <br />coating followed by one additional coat of Ceilcote 251 FG over the rolled- <br />in cloth. Allow to cure for 1 hour. <br />It will be owner's responsibility to flush or clean with rinse water after com- <br />pletion but not prior to 24 hours. Also, it will be owner''s responsibility <br />to remove all manways and make ready for entry at least one day before starting <br />day and to replace same upon completion. <br />Time require is two working days. <br />Terms of payment are 1%-10; net 30 <br />Guarantee shall be for one year provided that, upon entry, it is repairable <br />as set out in scope of work. <br />Due to the fact that we have only one ground storage tank at Fairmont <br />and that we are loosing large quantities of water, I would consider this an <br />emergency situation and it needs to be corrected immediately. <br />The Plastico Company has been instructed to go ahead with repairs and <br />they will start work on Tuesday, August 26th at 9:00 A.M. The tank will be <br />isolated from service for three days. <br />I have found a way to supply enough pressure and water supply by pumping <br />water straight from the well to the elevated tank. I will inspect the operation <br />• during repair. <br />CC: Fire Marshall <br />Joe Sease <br />City Administrator <br />Jim Hudgens <br />1n <br />u <br />