Laserfiche WebLink
<br />.. . <br /> <br />G. <br />7. <br />8. <br />9. <br />10. <br />11. <br /> <br />e <br /> <br />- <br /> <br />City of La Porte <br />Sewage Treatment Plant Improvements <br />Waste Sludge Pump Station <br /> <br />Construction Cost Estimate <br /> <br />Item <br /> <br />1. <br />2. <br />3. <br />4. <br />5. <br /> <br />New pump and motor <br />Modify existing pump and motor <br />Piping <br />Fittings <br />Valves <br />a. Plug valves <br />b. Check Valves <br />c. Air release valve <br />Concrete <br />Break out wall openings <br />Cut in existing pipe <br /> <br />, <br />Grading and site work <br />Electrical and controls <br />Miscellaneous hardware <br /> <br />Subtotal <br /> <br />12. Gontingency - 10% <br />" <br />Subtotal - Construction Cost Estimate <br /> <br />Engineering Design <br />Construction Phase Services <br />Total - Including Engineering <br /> <br />ell <br /> <br />" <br /> <br />........ - <br /> <br />October 10, 1983 <br />13-02000-005 <br /> <br />Estimated Cost <br /> <br />$ 3,200 <br />1,800 <br />GOO <br />2,100 <br /> <br />3,GOO <br />1,200 <br />300 <br />900 <br />lOO <br />200 <br />200 <br />6,000 <br />200 <br /> <br />$20,400 <br /> <br />2,000 <br /> <br />$22,400 <br /> <br />2,800 <br />4,700 <br />$29,900 <br />