My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-01-11 Workshop Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1984
>
1984-01-11 Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:58 PM
Creation date
3/21/2025 1:39:13 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/11/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.' ~' <br />• <br />DEVELOPMENT O~F A <br />FOR <br />PRIORITY CORRIDOR STUDIES IN THE <br />PURPOSE <br />TSM PLAN <br />ITEM 8c <br />Page 1 of 1 <br />HOUSTON-GALVESTON REGION <br />The proposed project would develop a plan for the systematic application of <br />Transportation System Management (TSM) techniques to major travel corridors <br />in the H-GAC region. <br />RarKr,RnuNn <br />Since the 1960's, Transportation System Management measures have been used in <br />the Houston-Galveston Area Council region to improve vehicular flow through <br />low-cost improvements that increase the efficiency of existing roadways. Typical <br />TSM actions include improvements such as coordinated signal timing among a series <br />of intersections, traffic channelization, one-way streets, reversible traffic <br />lanes, and parking and access controls. <br />Last year, H-GAC sponsored a study of the Bellaire/Bissonnet corridor, one which <br />traverses several communities. TSM recommendations were the primary products of <br />that report. In order to identify those corridors which would benefit most from <br />TSM applications, criteria should be developed to establish corridor travel defi- <br />ciencies, potential TSM solutions and relative study priority. <br />PRODUCTS <br />The major products of the proposed study include: <br />* Formal identification and inventory of major transportation corridors <br />(Video=taped route profiles have been proposed) <br />* Development of criteria to be applied to a corridor eligibility and <br />priority process. <br />* Identification of the "immediate priority" corridor(s). <br />* Description of a planning process designed to coordinate an <br />agenda of TSM studies to be administered by participating <br />agencies such as the SDHPT, MTA, City governments and H-GAC. <br />COST <br />The cost of the proposed project is estimated at $40-45,000 funded with FFIWA <br />Section 112 funds. <br />ACTION REQUESTED <br />Request authorization to submit a request for proposal to develop~a TSM Plan for <br />priority corridors in the H-GAC region at a cost not to exceed $45,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.