Laserfiche WebLink
n <br /> <br />ITEM 8b <br />Page 2 of 2 <br />The final East Side Reliever Airport Study product would be determination of <br />future general aviation demand and capacity and recommendations on the most <br />cost-effective way to improve the system to meet future demands. Reliever <br />designation of an east side airport is one possible means of meeting future <br />needs. <br />ACTION REQUESTED <br />It is requested that the Board authorize the Executive Director to negotiate <br />a contract for professional services not to exceed $10,000. <br />