Laserfiche WebLink
s <br /> <br />I-3 <br />• <br />TABLE 1 - UNIT CAPACITY OF EXISTING COLLEGE VIEW MUD PLANT <br />Average Peak <br />Lift Station 0.40 mgd* 1.60 mgd <br />Aeration Basin (with nitrification) 0.38 mgd --- <br />Blower 0.32 mgd --- <br />Clarifier 0.12 mgd* 0.49 mgd <br />Chlorine Basin 0.08 mgd* 0.34 mgd <br />Digester 0.53 mgd --- <br />*Based on a peak average flow ratio of 4. <br />Sewer Master Plan for the City of La Porte <br />• The City of La Porte is currently in the process of prepar- <br />ing a wastewater master plan for the the purpose of defining <br />system improvements required to rectify existing deficient ele- <br />me nts and to serve future development within its planning area. <br />Two projects of major importance identified in the study are <br />construction of a relief trunk sewer extending from the La <br />Porte main sewage treatment plant to the College View area and <br />enlargement of the La Porte Wastewater Treatment Plant to accomo- <br />date the high peak wet weather flows. <br />The primary intent of the trunk sewer project is to relieve <br />the existing overloaded conditions in the 21-inch sanitary sewer <br />currently serving the Fairmont Park and Lomax areas adjacent to <br />College View. Construction of the proposed relief trunk will <br />• provide adequate sewer capacity in the area, including College <br />TurrterCollie c~Braclen Inc. <br />