Laserfiche WebLink
~ • <br />I-4 <br />• <br />View; thus the master plan also calls for the abandonment of the <br />College View MUD plant and the diversion of wastewater to the La <br />Porte main plant for treatment. While construction of the relief <br />trunk sewer is underway, the existing La Porte Wastewater Treat- <br />ment Plant will be enlarged to provide increased wet weather <br />capacity. As currently envisioned, these projects should be <br />completed by early 1986. The planned diversion scheme is shown <br />in Exhibit 1. It should be noted that line sizes shown are <br />preliminary and may vary in the final wastewater master plan <br />report. <br />• <br />C~ <br />TumerCdlie c~Br~clen Inc <br />