Laserfiche WebLink
SECTION II - PROPOSED COMPLIANCE SCHEDULE FOR THE II-1 <br />COLLEGE VIEW MUD TREATMENT PLANT <br />• <br />In an effort to canply with terms of the existing College <br />View MUD wastewater discharge permit (No. 10921-01) , the City <br />of La Porte has voluntarily prepared this schedule of compliance <br />for review by the TDWR. In accordance with the requirements of <br />the existing permit, the following information is needed for the <br />proposed compliance schedule. <br />(1) A description of the noncomplying discharge including <br />its impact upon the receiving waters; <br />(2 ) Cause of noncanpl fiance; <br />(3) Anticipated time the condition of noncompliance is <br />expected to continue, or if such condition has been corrected, <br />• the duration of the period of noncompliance; <br />(4) Steps taken by the permittee to reduce and eliminate <br />the noncomplying discharge; and <br />(5) Steps to be taken by the permittee to prevent recur- <br />rence of the condition of noncompliance. <br />Responses to each item are as follow: <br />(1) and (2) Based on the rated capacities of the existing <br />treatment units, plant discharge may be non-compliant in the <br />treatment levels of chlorination and total suspended solids <br />discharged. <br />(3) Noncompliance of effluent limitations can be expected <br />to continue until design deficiencies are remedied or until <br />wastewater flows from the service area are diverted to the La <br />• Porte wastewater Treatment Plant. Since the City's master <br />TumerCollie c~Braden Inc. <br />