11 <br />•+-- } J <br />• <br />• <br />MINUTES OF MEETING <br />• <br />Re <br />Purpose: <br />Date :_ <br />Location: <br />Attendees: <br />• <br />u <br />Discussion <br />City of La Porte <br />Cleaning, Television Inspection, and Point Repairs for <br />Portions of Sanitary Sewer Collection System <br />To discuss awarding a construction contract for the <br />referenced project. <br />May 4, 1984 at 1:30 p.m. <br />Turner Collie & Braden's offices <br />Jack Uwens <br />Char le s Dippe 1 <br />Joe Hedding <br />Arch McNeill <br />Paul Rushing <br />Bruce Baumel <br />Frank Marino <br />City of La Porte <br />Sears & Burns <br />Turner Collie & Braden <br />Turner Collie & Braden <br />Turner Collie & Braden <br />Turner Collie & Braden <br />Turner Collie & Braden <br />1. The bid tabulation was reviewed. The apparent low bidder is <br />Baytown Construction, second bidder is Reliance Construction, <br />and third bidder is Channel Construction. <br />2. No obvious irregularities were found with the proposal section <br />(bid items) of the bid documents for the apparent low and third <br />bidder. However, the second low bidder's unit price for Item <br />No. 19, Removal and Replacement of House Taps, seems to indicate <br />a misunderstanding of Addendum No. 1 concerning this Item or an <br />unbalancing of the bid. <br />3. Earlier in the day, the second low bidder had indicated his <br />intention to protest the award of contract to the apparent low <br />bidder because the latter's documents did not include executed <br />MBE forms. - - -- ' - - <br />4. The ability of the apparent low bidder to successfully complete <br />the project was discussed because his bid -is approximately <br />59 percent lower than that of the second low bidder (44-percent <br />lower than Engineer's estimate). In addition, the apparent low <br />bidder's qualification statement does not indicate any past <br />experience in the cleaning and television inspection area. <br />5. The bids of the other two bidders are not desirable since they <br />are approximately 40 percent higher than the Engineer's estimate. <br />6. If the low bidder is selected, a protest may occur based on his <br />not including executed MBE forms with his proposal. H,is ability <br />-1- <br />L= a- <br />M <br />