Laserfiche WebLink
! -~ = • <br />_~_ <br />• <br /> <br />L <br />AttacYutient "A" <br />La rur ~i SWilta.~ -1iGWG.a' Sy~~ilL ~`IprVVCiIr.~{itr7 <br />• <br />C~. WLL iS I...I. u~W J \.r\./St5 <br />1. Relief Sanitary Sewer $4,311,000 <br />2. Main Sewage Treatment Plant Expansion 3,365,000 <br />3. Modifications to College View Lift Station 45,000 <br />Total Construction Cost* $7,721,000 <br />B. EngineeringCosts <br />1. Basic Servioes <br />a. Special Studies and Reports Phase $ 12,000 <br />b. Preliminary Design Phase 58,000 <br />c. Final Design Phase 252,000 <br />d. Construction Phase 78,000 <br /> Subtotal Basic Services $ 400,000 <br />2. Special Services <br />a. Surveys $ 30,000 <br />b. Geotechnical Work 35,000 <br />c. Miscellaneous Engineering Assigrm~x~ts 10,000 <br />d. Project Representatives 240,000 <br />Subtotal Special Services $ 315,000 <br />Total Engineering Costs $ 715,000 <br />• <br />Total Costs** $8,436,000 <br />• <br />.*Includes 15$ Construction Contingencies <br />**Does not include land costs, legal fees or cost of bared sales associated <br />with Project <br />E~ <br />