My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-06-20 Regular Meeting of La Porte City Council
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1984
>
1984-06-20 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
3/21/2025 1:40:14 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/20/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ ~ • <br />n <br />U <br />• <br />TurnerCollie~Braden Inc. <br />April 30, 1984 <br />Mr. Jack Owen <br />City of La Porte <br />Page Two <br />Attachment "D" is an analysis of basic services engineering <br />fees for a project of this size based on the fee curves shown <br />in the TSPE manual. Our proposed fee for basic services is <br />$85,000 below the fee calculated from the curves. This amount <br />represents the value of the recently completed Comprehensive <br />Wastewater Collection and Treatment Plan as it applies to this <br />project plus the value of other work we performed for the City. <br />Attachment "E" presents the resumes of the key personnel involved <br />in this project. The resumes of the Principal in Charge, Project <br />Director, alternate Project Director, Project Manager and Project. <br />Engineers are included, along with the resumes of several of the <br />primary design engineers available to work on this assignment. <br />We propose to complete the Preliminary Design and Final Design <br />phases within 180 days after authorization (150 days to complete <br />work and 30 days for approval of plans and specifications) for <br />the Fairmont Parkway Relief Sewer and within 240 days after <br />authorization (210 days to complete work and 30 days for approval <br />of plans and specifications) for the Expansion of the Main <br />Wastewater Treatment Facility. All work outlined in Paragraphs <br />II.A. and II.B. of the Agreement will be finished within 45 <br />days after authorization. <br />Should you or your staff wish to discuss any of the information <br />presented here in more detail, we would be happy to do so. We <br />appreciate the opportunity to submit this Agreement for Engineer- <br />ing Services for your consideration. <br />Very truly yours, <br />~~-'~" <br />i <br />H. Cecil Allen, P.E. <br />Project Director <br />HCA:RCR:lf <br />Attachments <br />cc: Jerry Hodge w/attachments <br />• John Joerns w/attachments <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.