Laserfiche WebLink
.. • <br />\ -~"-- <br />• <br />• <br />• <br />u <br />9 <br />>~: <br />TumerCollie~Braden Inc. <br />April 30, 1984 <br />Mr. Jack Owen <br />City Manager <br />City of La Porte <br />P. 0. ~ Box 1115 <br />La Porte, Texas 77551 <br />Re: La Porte Sanitary Sewer System Improvements <br />Turner Collie & Braden Job No. 13-02000-010 <br />Dear Jack, <br />H. CECIL ALIEN <br />VICE PRESIDENT <br />PO BOX 13089 <br />HOUSTON, TEXAS 77219 <br />5757 WOODWAY <br />713 780.4100 <br />TELEX 774185 TCB HOU <br />We are happy to present two (2) draft copies of an Agreement <br />for Engineering Services for your review for the above ref- <br />erenced project. <br />We estimate that the probable Total Construction Costs for the <br />project will be $7,721,000 (see Attachment "A"). We propose <br />to provide engineering for the Basic Services outlined in this <br />Agreement for $400,000 (see Attachment "A") and we estimate <br />that the Special Services will be approximately $315,000 (see <br />Attachment "A"), should the City authorize full time construc- <br />tion Project Representatives for both construction contracts. <br />If the City elects to furnish one or more of the Project <br />Representatives or elects to have only part time services <br />provided on one or more of the construction contracts, the <br />cost would be less. The responsibilities of the construction <br />Project Representatives will include on-site observation of <br />construction, review of materials and workmanship, preparation <br />of daily written reports, and daily communication and co- <br />ordination with the contractors. Basically, the Project <br />Representative's function is to see that the construction work <br />is completed in accordance with the plans and specifications. <br />Attachment "B" represents a breakdown of probable construction <br />costs into those attributable to abandonment of the College <br />View MUD wastewater treatment facility and conveyance of its <br />flow to the existing City main wastewater treatment facility <br />and those that can be attributed directly to the growth of <br />the City of La Porte. <br />Attachment "C" presents the general tasks required to complete <br />this project and includes both Basic Services and Special <br />Service items. <br />~~~~ ~ <br />CONSULTING ENGINEERS • TEXAS AUSTIN/DALLAS/EL PASO/HOUSTON/PORT ARTHUR COLORADO DENVER/CRAND JUNCTION <br />