My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1985-01-21 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1985
>
1985-01-21 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
3/21/2025 1:41:00 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/21/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ T0: <br />City Manager <br />• <br /> <br />• <br />FROM: <br />John Joerns <br />REQUEST FOR CITY COUNCIL AGENDA ITEM 2 <br />1. Agenda Date Requested: January 21, 1985 <br />Date: January 17, 1985 <br />X Report <br />Resolution <br />Ordinance <br />3. Project Summary: On May 23, 1984, the City reached an agreement with <br />Fairmont Plaza Joint Venture that provided for the abandonment of 12th <br />Street between Fairmont Parkway and West "K" The agreement further <br />called for the contribution of $75,000 by Fairmont Plaza Joint Venture <br />to cover the expenses associated with the relocation of a 36" Sanitary <br />Sewer which was to be completed by the City within 18 months. <br />4. Action Required: the City needs to execute a contract with TC&B to <br />provide for additional services necessary to prepare plans and <br />specifications ahead of the original schedule. <br />s. Alternative: N/A. The City is already under contract with TC&B to provide <br />design services for the trunk sewer. This contract is necessary to <br />meet the City's committment to relocate the 36" Sanitary. Sewer within the <br />18 month time frame stipulated in the City's agreement. <br />6. Recommendation: Execution of the Engineering Services Agreement with <br />TC&B. The estimated costs do not include any of the services provided <br />for under the Agreement for design of the Fairmont Parkway relief <br />sewer. Also, note that the estimated costs for the project representative, <br />if authorized, will reduce the costs for project representation during <br />the construction of the Fairmont Parkway Relief Sewer. <br />Estimated Costs: Design Phase $ 3,000 <br />Construction Phase 6,400 <br />~. Exhibits: Attached is the <br />proposed agreement for (not to exceed) $ 9,400 <br />Engineering Services with TC&B Project Rep. $17,500 <br />Total Estimated Budget: $26,900 <br />8.Availability of Funds: General Fund Water/Wastewater <br />Capital Improvmt. General Revenue Sharing <br />X Other <br />Account Number: $75,000 contribution Funds Available: Yes No <br />from Fairmont Plaza Joint Venture <br />rns <br />P.eauested <br />9, pprov d for City Council Agenda <br />~~ <br />City Manager Date <br />'- <br />
The URL can be used to link to this page
Your browser does not support the video tag.