Laserfiche WebLink
<br />TurnerCollie~Braden Inc. <br />April 29, 1987 <br />Mr. Pat O`Malley <br />City of La Porte <br />Page Two <br />• <br />e. Preparation of design layout for review and approval <br />of City of La Porte. <br />f. Revision of four contract drawings showing the new <br />line location. This required the revision to three <br />plan and profile sheets and one layout sheet. <br />g. Preparation of the change order documentation for <br />submittal to the City and contractor. <br />h. Negotiation of prices for the work with the contractor. <br />We had estimated 96 manhours to complete the above described <br />work. The estimated breakdown of costs were: <br />Engineer $1,560 <br />Technician 2,880 <br />Printing 160 <br />Total $4,600 <br />