My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-07-06 Called Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1987
>
1987-07-06 Called Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
3/21/2025 1:42:16 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/6/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~i <br />TurnerCollie~Braden Inc. <br />June 23, 1987 <br />Mr. Bob Herrera, City Manager <br />City of La Port e <br />P. O. .Box 1115 <br />La Porte, Texas 77571 <br />Attention: Mr. Pat O'Malley <br />H. CECIL ALLEN <br />VICE PRESIDENT <br />PO BOX 13089 <br />HOUSTON, TEXAS 77219 <br />5757 WOODWAY <br />713 780-4100 <br />TELEX 774185 TCB HOU <br />Re: Fairmont Parkway Relief Sanitary Sewer <br />Change Order No. 6 <br />Contractor: McKey Construction & Equipment Co., Inc. <br />Contract Amount: $2,278,581.40 <br />Turner Collie & Braden Project No. 13-02000-034 <br />Gentlemen: <br />In accordance with direction by the City of La Porte, Change Order <br />No. 6 has been prepared to (1) modify the scope of work to accom- <br />modate extra work associated with an additional sanitary sewer <br />line and (2) extra work relating to newly installed asphalt drive- <br />way. <br />As a result of the above referenced extra work, the following <br />changes are herewith being made as part of this Change Order: <br />MODIFICATION TO SCOPE OF WORK <br />1. In accordance with Revised Plan Sheets 8 and 9 of 35 <br />(attached hereto and herewith being made a part of this <br />change. order) add the following quantities to accommodate <br />the modifications to the scope of work: <br />(a) Add the installation of one (l) 12-inch diameter <br />stub-out to previously installed manhole No. 18 <br />to accommodate the "tie--in" of a proposed 12-inch <br />diameter PVC gravity sanitary sewer line. <br />As a result of this modification, add line item 54 to the <br />contract proposal as follows: <br />Line Item 54 <br />Contract Contract Contract <br />Description Unit Quantity Price Amount <br />Install 12-inch L.S. <br />diameter stub-out <br />to north side of <br />M.H. 18, CIP <br />1 $1,100 $1,100 <br /> <br />CONSULTING ENGINEERS • TEXAS AUSTIN/DALLAS/HOUSTON/PORTARTHUR COLORADO DENVER <br />
The URL can be used to link to this page
Your browser does not support the video tag.