Laserfiche WebLink
• <br />TurnerCollie~Braden Inc. <br />June 23, 1987 <br />Mr. Bob Herrera, City Manager <br />City of La Porte <br />Page Two <br /> <br />The addition of line item 54 will result in a contract <br />price increase of one thousand one hundred dollars and <br />no cents $1,100.00 <br />(b) Add ninety (90) lineal feet of 12-inch PVC gravity <br />sanitary sewer installed in tunnel. As a result <br />of this modification, add line item 55 to the <br />contract proposal as follows: <br />Line Item 55 <br />Description Unit <br />Contract Contract Contract <br />Quantity Price Amount <br />12-inch diameter L.F. <br />PVC gravity san- <br />itary sewer <br />installed in <br />tunnel, CIP <br />90.0 $70.00 $6,300 <br />The addition of line item 55 will result in a contract <br />price increase of six thousand three hundred dollars <br />and no cents $6,300.00 <br />(c) Add ninety-eight (98) lineal feet of 12-inch PVC <br />gravity sanitary sewer, all depths, with cement <br />stabilized backfill, in open cut. As a result of <br />this modification, add line item 56 to the con- <br />tract proposal as folloc.~s: <br />Line Item 56 <br />Description Unit <br />Contract Contract Contract <br />Quantity Price Amount <br />Install 12" gravity L.S <br />PVC sanitary sewer, <br />in open cut, all <br />depths with cement <br />stabilized sand <br />backfill, CIP <br />1 $1,800 $1,800 <br />The addition of line item 56 will result in a contract <br />price increase of one thousand eight hundred dollars <br />and no cents $1,800.00 <br />