My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-07-06 Called Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1987
>
1987-07-06 Called Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
3/21/2025 1:42:16 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/6/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />TurnerCollie c~Braden Inc. <br />June 23, 1987 <br />Mr. Bob Herrera, City Manager <br />City of La Porte <br />Page Five <br />• <br />(i) Add two (2) each break outs to existing manhole <br />Nos. 7 and 7A. <br />As a result of this modification, add line item 61 to <br />the contract proposal as follows: <br />Line Item 61 <br />Contract Contract Contract <br />Description Unit Quantity Price Amount <br />Break out existing Each 2 $150.00 $300.00 <br />manhole for instal- <br />lation of 8-inch PVC <br />sanitary sewer,CIP <br />The addition of .line item 61 will result in a contract <br />price increase of three hundred dollars and no cents. $300.00 <br />2. Extra Work Associated with Newly Installed Asphalt Driveway <br />As a result of encountering a recently paved asphalt entrance <br />drive, the following scope of work was accomplished by the <br />Contractor on or about station 70+80 (Plan Sheet 9 of 35) <br />and is .herewith included in the change order by the addition <br />of line item 53: <br />2.1 Furnish 24.02 tons of asphalt, for resurfacing <br />after open cut, at $26.96 per ton (see attached <br />monthly estimate breakdown request and invoice <br />from Dravo Natural Resources) <br />Total Value Asphalt = $647.10 <br />2.2 Furnish 10 tons of limestone base at $14.00 per ton <br />Total Value of Limestone = $140.00 <br />2.3 Labor & Equipment <br />12 G Maintainer - 9 hrs. _ $ 495.00 <br />Flat Wheel Roller - 9 hrs. = 315.00 <br />Labor - 9 hrs. = 190.00 <br />Total Value of Labor & $1,000.00 <br />Equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.