Laserfiche WebLink
• <br />TurnerCollie~Braden Inc. <br />June 23, 1987 <br />Mr. Bob Herrera, City Manager <br />City of La Porte <br />Page Four <br />• <br />The addition of line item 58 will result. in a contract <br />price increase of two thousand two hundred eighteen <br />dollars and fifty cents. $2,218.50 <br />(g) Add one (1) each clean out to end of proposed <br />8-inch diameter gravity sewer. As a result of <br />this modification, add line item 59 to the con- <br />tract proposal as follows: <br />Line Item 59 <br />Contract Contract Contract <br />Description Unit Quantity Price Amount <br />Install clean Each 1 $250.00 $250.00 <br />out on 8-inch PVC <br />gravity sanitary <br />line <br />The addition of line item 59 will result in a contract <br />price increase of two hundred fifty dollars and no <br />cents. $ 250.00 <br />(h) Add one (1) each sanitary sewer service connection <br />to proposed 8-inch PVC gravity sewer line. As a <br />result of this modification, add line item 60 <br />to the contract proposal as follows: <br />Line Item 60 <br /> Contract Contract Contract <br />Description Unit Quantity Price Amount <br />Install sanitary Each 1 $300.00 $300.00 <br />sewer service <br />connection, CIP <br />The addition of line item 60 will resul t in a c ontract <br />price. increase of three hundred dollars and no cents. $ 300.00 <br />