Laserfiche WebLink
~` <br />Page Two <br />Interview and Final Selection <br />July 15, 1987 <br /> <br />The entire process was limited to one and one-half (1 1/2) <br />hours. Parts 1, 2, and 3 were limited to twenty (20) minutes, <br />Part 4 approximately one (1) hour, and Part 5 approximately five <br />(5) to ten (10) minutes. The interviews were conducted as an <br />executive session of the LPAWA. Copies of the necessary legal <br />certification are attached. In addition, all interviews were <br />taped. <br />Interviews were held on July 9, 1987 with the firms CRS Sirrine (6:00 <br />to 7:30 P.M.) and Turner Collie and Braden (7:30 to 9:00 P.M.). On <br />July 10, 1987, interviews were held with Dannenbaum Engineering (2:00 <br />to 3:30 P.M.) and Espey Huston (3:30 to 5:00 P.M.) After the final <br />interview on July 10, 1987, the committee briefly met, and decided to <br />use the same evaluation and rating system developed and used in the <br />initial selection process. It was agreed to meet again on July 14, <br />1987, at 6:30 P.M., to tabulate the findings. <br />The committee met on July 14, 1987, and compiled the results of the <br />individual committee members, and established weighting factors for <br />the three (3) categories used in the evaluation. <br />The results of the combined evaluations are shown on Exhibits A and <br />B, copies of which are attached. Exhibit A shows the determination <br />of weighting factors for each category. Exhibit B shows the ratings <br />by individual committee members, the average rating, the agreed <br />weighting factor, and the final rating for each of the three (3) <br />categories, "Personnel Qualifications", "Experience of Firm", and <br />"Methodology", as well as the final tabulation of all three (3) <br />categories with a ranking of the firms. <br />Based on the interviews and evaluations, the committee submits the <br />following summary and recommendations: <br />A. The final ranking of firms, from highest rated to lowest, <br />are as follows: <br />1. Espey Huston and Associates <br />2. Dannenbaum Engineering <br />3. CRS Sirrine <br />4. Turner Collie & Braden <br />B. The LPAWA Board appoint a committee to conduct negotiations <br />with Espey Huston and Associates on scope of work and <br />professional compensation. <br />