My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-07-27 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1987
>
1987-07-27 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
3/21/2025 1:42:19 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/27/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />..... . <br /> <br />6. Identify neighborhood impacts of the proposed <br />improvements and present alternate solutions with associated cost <br />and recommend, with reasoning for recommendation, solutions to <br />the problems. <br /> <br />7. Identify neighborhood impacts during construction <br />and propose recommendations for re-routing and/or detours. <br /> <br />8. Determine and define all regulatory agency <br />requirements such as Harris County Flood Control District, and <br />assemble applicable codes and standards. <br /> <br />9. Identify all problems encountered, present <br />alternate resolutions for each problem, and recommend, with <br />reasoning for recommendation, problem solutions. <br /> <br />10. Outline design criteria for each element of design <br />and standards and methods used for each element. <br /> <br />11. Prepare scope of work, schedule and proposed budget <br />for the Design Phase, including breakdown of all other services <br />required to complete the Design Phase. <br /> <br />12. Prepare Preliminary Plan and Engineering Report <br />with Preliminary Cost Estimate and furnish 15 copies of bound <br />report to City. <br /> <br />DESIGN PHASE <br /> <br />Upon completion of Preliminary Engineering Phase, and upon <br />written approval of the Preliminary Engineering Report by the <br />City, the Engineer shall proceed with Design Phase. Work to be <br />performed in the Design Phase shall include the following: <br /> <br />1. Conduct field surveys necessary to complete the <br />design of the project. i.e.: Cross-sections and topography. <br /> <br />2. Obtain additional soils and foundation <br />investigations, which in the opinion of the Engineer may be <br />required, if approved by the City and assist the City in <br />arranging for such work to be done, for the City's account. <br /> <br />3. Complete design criteria, establish design <br />standards and methods. <br /> <br />4. Complete design of storm drainage system, establish <br />size and grade of conduit, and inlets. Establish final location <br />of conduit, inlets and manholes. <br /> <br />Page 3 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.