Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />r ' <br /> <br />The Construction Phase is not scheduled to occur until such <br />time as additional General Obligation bonds are sold, and <br />therefore is not a part of this contract. <br /> <br />II. SCOPE OF SERVICES <br /> <br />ENGINEERING AND DESIGN: <br /> <br />Project Manager for this project will be Mr. H. Carlos <br />Smith, P.E., assisted by Mr. Curtis L. Muncy, E.I.T. Schedule of <br />work is detailed below. Consultations with City staff, <br />regulatory agencies and utility companies will be on going as the <br />project progresses. <br /> <br />PRELIMINARY ENGINEERING PHASE <br /> <br />The purpose of the Preliminary Phase is to define the <br />overall concept and refine the scope of work of the project to be <br />incorporated in the Design Phase. Major questions of design and <br />utility interference will be resolved with an "end product" to be <br />clearly defined. <br />Work to be performed in the preliminary phase will include: <br /> <br />1. Preparation of preliminary drainage design, <br />defining drainage areas, preliminary layouts sizing of conduits, <br />and the placing of appurtenances. Define design criteria used. <br /> <br />2. Establish and recommend the scope of any soil and <br />foundation investigations, which in the opinion of the Engineer <br />may be required; if approved by the City, the Engineer shall <br />assist the City in arranging for such work to be done, for the <br />City's account. <br /> <br />3. Conduct field surveys necessary to identify public <br />and franchise utilities and related structures within or crossing <br />the right-of-way and to determine their interference with the <br />proposed improvements. The City of La Porte will furnish <br />equipment and labor and assist in utility location. The <br />frequency and scheduling of those services shall be determined by <br />the Director of Community Development and approved by The <br />Director of Public Works. <br /> <br />4. Identify and locate by field survey any privately <br />owned facilities or structures within or adjacent to the right-of- <br />way. <br /> <br />5. Identify conflicts or interferences with future <br />planned City Capital Improvement Projects. <br /> <br />Page 2 of 16 <br />