Laserfiche WebLink
Mr. Robert T. Herrera <br />' '• ~- City of La e / (LAP654) <br />~.- October 12,7 <br />/ Page 2 <br />SWA has investigated methods of reducing the • <br />construction costs, but these cuts drastically reduce <br />the quality of the Park. <br />_ ~. ~ w ~ ~z .- ~ ~ i~u? i_ . ,. - <br />Th~e inherent nature of this type of park construction <br />requires the labors of many different crafts and, <br />_ therefore,•-minimizes the number of interested general <br />contractors~~willing to construct park projects. <br />Reorganizing the park construction into smaller <br />acceptable packages will increase the number of bidders <br />and create a more competitive bidding effort. Prior to <br />releasing the documents, SWA will incorporate design <br />revisions that have been identified in the review <br />process since the receipt of bids. Attached for your <br />review is a Proposed Schedule for the rebidding effort, <br />Bid Summary and Recommendations for Price Reduction. <br />We are prepared to begin the effort immediately. If I <br />can be ~€~further~assistance please call me, <br />Sincerely, <br />~~ <br />John Cutler <br />Pr' pal <br />Attachments: - Proposed Schedule for Re-Bidding <br />- Bid Summary <br />- Recommendations for Price Reduction <br />JC/d <br />LAP654/Job <br />cc: Mr. Pat O'Mally - City of La Porte <br />Mr. John Joerns - City of La Porte <br />Via ROT/Direct <br />The SWA Group <br />1245 West 18th Strut <br />Houston, TX 77f~ <br />7t3-868.1878 <br />