Laserfiche WebLink
th~.swe group • <br />,,~' o <br />Kelvin Platt <br />Thomas Adams <br />Walt Bemis <br />William Ca-laway <br />Gerry Campbell <br />Dennis Couturo <br />John E Cutter <br />Robert Elliott <br />Jean Marie Gatti <br />P. Michael Gilbert <br />Lori Hjort <br />Roy Imamurs <br />Robert Jacob <br />Thomas S. James <br />Edmond Kagi <br />Gary Kamer <br />Albert R. lamb III <br />Richard taw <br />James lee <br />Clifton Lowe <br />Charles S. McDaniel <br />Justiniano Mendoza <br />Christopher L Miller <br />Frederick P. Pariani <br />James Reeves <br />R. Joseph Runco <br />Eduardo Santaella <br />Michael Sardine <br />Kevin Shanley <br />Wendy Simon <br />Richard Thomas <br />Oonald H. Tompkins <br />Douglas S. Way <br />John M. Weed <br />Susan Whitin <br />John Wong <br />October 12, 1987 <br />Mr. Robert T. Herrera <br />City Manager <br />City of La Porte <br />654 West Fairmont Parkway <br />La Porte, Texas 77571 <br />Attn: Mr. Ross Cox <br />Capital Improvements Project Manager <br />Re: Little Cedar Bayou Park <br />(LAP 654) <br />Dear Mr. Herrera: <br />SWA Group recommends that all of the bids received on <br />September 11, 1987 for Site Development of Little Cedar <br />Bayou Park be rejected and that the bid documents be <br />restructured into several separate bid packages under <br />the supervision of the City of La Porte's Construction <br />Management Consultants and in coordination with the <br />appropriate City of La Porte staff. <br />The bids received ranged from a low of $1,732,078.00 to <br />a high of $2,047,000.00. Ten 'Add' Alternates and one <br />'Deduct' Alternate were received with the bids. <br />Separate bids for the fishing pier ranged from a low of <br />$39,848.00 to a high of $46,000.00 <br />The minimum acceptable park development package is as <br />follows: <br />Base Bid $1,732,078.00 <br />Alternate Two <br />(Wave Pool Equipment 146,108.00 <br />Fishing Pier 39,848.00 <br />Total $1,918,039.00 <br />Sausatib <br />Laguna Beach <br />Houston <br />Dallas <br />Boston <br />Florida <br />This total is $353,369.00 or 22.6 over the project <br />budget of $1,564,665.00 <br />1245 Wiest 18thStreet <br />Houston. TX 77008 <br />713-868.1878 <br />