Laserfiche WebLink
• • <br /> <br />page two <br />East "E" Street Sewer <br />May 13, 1988 <br />It is Staff"s recommendation that the Engineer currently designing the <br />East "E" Street improvements, H. Carlos Smith, be contacted as to the <br />possibility of his firm performing the design work for replacement of <br />this section of line and maintain the schedule for the completion of <br />East "E" design. If we are unsuccessful in negotiating a contract with <br />H. Carlos Smith in a timely manner, we should pursue the services of <br />another consultant. It is critical that this section of line be <br />replaced due to its deteriorated condition and that it be done very <br />soon. There is a very real possiblility of another collapse at any <br />time. Other forms of sewer rehabilitation are not feasible due to the <br />extremely poor condition of the line. <br />There is a possiblility of utilizing some portions of this line that <br />have been replaced in the past. This could be determined at the time <br />of construction and be taken as a deduct from the total contract. <br />We would like to present both the preliminary Engineering Report on <br />East "E" Street and certain footage of the televised sanitary sewer <br />line to City Council on June 6, 1988. <br />