My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1991-08-26 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1990's
>
1991
>
1991-08-26 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:02 PM
Creation date
3/21/2025 1:47:17 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/26/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />u.s. j3oy't <br />.. . <br /> <br />e <br /> <br />e <br /> <br />acquisition and contract administration of all professional, <br />personal, non-professional, A-E construction activities <br />leases, and all state Department of Highways and Public <br />Transportation construction services which used METRO federal <br />funding. Ensured compliance with all METRO contractual re- <br />quirements, and applicable federal, state, and local laws and <br />regulations. Developed and implemented control procedure <br />standards for effective administration of service contracts <br />and standard document formats. Reviewed technical scope and <br />cost estimates and provided project managers, financial, and <br />managerial personnel the training and guidance necessary to <br />effectively manage a project. Chaired the Source Evaluation <br />Committee on all negotiated procurements in excees of $25,000 <br />and reported the findings of such activities to senior man- <br />agement and the appropriate subcommitees of the Board of Dir- <br />ectors for selection. <br /> <br />(3) In October 1983 I was appointed as the North Transitway <br />Project Manager wherein my responsibility was to manage and <br />administer a $52 million project for converting the <br />Contraflow Lane to a barrier-protected Authorized Vehicle <br />Lane (AVL). In addition, I continued my procurement <br />responsibilities by administering all METROjSDHPT contracts <br />for AVL environmental impact analysis, study, and design for <br />the Gulf and Katy Freeway AVL's. In each instance, agreements <br />with state agencies were negotiated for use of personnel to <br />serve as Resident Engineers when state right-of-way was <br />involved and METRO was funding the projects. <br /> <br />(4) In May 1984, I rejoined NASAjJSC procurement as a <br />contract specialist and continued performing the complete <br />procurement function from the initial stage of procurement <br />planning through the development of the Request for <br />Proposals, the evaluation of 'proposals, negotiation, and the <br />administration of contracts and grants to final closeout. The <br />duties include an extensive range of supply, service, study. <br />facility, and complex R&D procurements. These procurements <br />are usually unique, lack direct precedent, involve dif- <br />ficulty in defining the work to be performed, and require <br />extensive coordination within the Center and agency to meet <br />budget, program, and procurement requirements. <br /> <br />During this period, I advanced to a journeyman contract <br />specialist and I was appointed to the Science Payloads <br />Development, Engineering, and operations Source Board as the <br />senior procurement representative. <br /> <br />I was promoted to Contracting Officer in July, 1986 and <br />in January, 1989 was selected as the Senior Procurement Ana- <br />lysist assigned to the Procurement Operations Branch. My <br />functions include the comprehensive review of all major pro- <br />curements prior to final approval by the Director of Procure- <br />
The URL can be used to link to this page
Your browser does not support the video tag.