My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1992-06-22 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1990's
>
1992
>
1992-06-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:03 PM
Creation date
3/21/2025 1:48:14 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/22/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM CLRUNCH & MILLER. INC. <br />..... , . <br />:. <br />Juno 15, 1992 , <br />06.17.1992 10:17 N0. 3 P. 2 <br />CLA ~ <br />UNCH & MILLER, INC. <br />Engineering Consultants <br />Mr. Robert Herrera <br />City Manager <br />City of La Porte <br />P. 0. Box 1113 <br />La Porte, Texas 77572-1115 <br />Re: Bngineering Services for the Farrington waterline Project <br />Dear Mr. Herrera: <br />Claunch & Miller, Inc. (CHI) is pleased to submit this proposal for <br />providing engineering services on the above referenced project. <br />DESCRIPTION Og PROJ .T; ' <br />The project is for the replacement of a 12" waterline along the west side <br />of Farrington Blvd. from Spencer Highway to an elevated water storage <br />tank, a distance of approximately 3,000 linear feet. It also includes <br />replacement of the sidewalk on the west side of Farrington Blvd. <br />As per the City's directions, a sew PVC 12" waterline will replace the <br />existing cast iron 12" waterline. The alignment for the waterline will be <br />between the western curb and the western R.O.W. of Farrington Blvd. in the <br />same proximity as the existing waterline, <br />mpg <br />The scope of engineering services and the associated fees are as follows: <br />SYJRVEY 3E1tVi .RS <br />o Provide survey services and base mapping of the project site <br />suitable for design. <br />o The survey will provide information on the west side of <br />Farrington from Spencer Highway to the Elevated Water Tank. <br />The survey will also provide information on existing utilities, <br />including aanholes and water meters and valve information in <br />the median and on the east side of Farrington $Ivd. <br />L E VI ES <br />o Provide a geotechnical report presenting an investigation of <br />the soils in the project area. <br />o The geotechnical report will provide usual and customary <br />information on the existing soil, It will also include bedding <br />and backfill recommendations, and trench safety information. <br />The report will be based on information obtained from three (3) <br />ten (IO) foot deep borings in the project area, <br />370! Kirby Drive, Suite 892 • Houston, Texas 77098 • (713) 524-7113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.