Laserfiche WebLink
FROM CLRUNCN & MILLER. INC. 06.17.1992 10s16 N0. 3 P. 3 <br />~ ~;y; <br />~.ai1;"ri'W e~d.k 4.~ti.~. <br />PRELIMINARY ENGINE.a~ ASF <br />o Research existing utilities in the project area. <br />o Deteraine a recoaaended alignment for the new waterline <br />o Deteraine construction method and/or ceheduling to miniaize <br />disruption of water service to the coawunity: <br />o Prepare estimated construction costs for th® project. <br />o Develop a project schedule. <br />o Prepare a report presenting the findings, costa, schedules and <br />appropriate sketches or exhibits of recomaended improvements. <br />o Provide five (5) copies of the preliainary engineering report <br />to the City of La Porte. <br />o The preliainary phase will be completed in 21 calendar days <br />from the City's written authorisation to proceed with this <br />phase <br />DES_~GN ENGINEERING PHA4R <br />a Prepare detailed plan and profile drawings of the final design <br />as presented in the preliminary engineering report. These <br />plans will be at a scale of 1" - 20' horizontal and 1" - 2' <br />vertical.' Drawings will be prepared through C.A.D.D. (Computer <br />Aided Design and Drafting). The C.A.D.D. file will be supplied <br />to the City of I.a Porte. <br />o Prepare contract specifications suitable for bidding. <br />a Prepare an update of the construction cost based on the final <br />design. <br />o Flxrnish five (5) sets of construction documents to the City of <br />La Porte. <br />o The design phase will be completed in 22 calendar days from the <br />City's written authorization to proceed with the design phase. <br />CONSTRUCTION ADh[zNISTRATI P ASS <br />o Assist the City in obtaining bids for the Project. <br />o Dispense construction documents from CMI's office to potential <br />bidders. <br />