Laserfiche WebLink
<br />The <br />URETEK <br />Method's <br />ftt <br />URETEK USA, INC. <br />August 13, 1992 <br />Mr. F.D. Thompson, P.E. <br />City Engineer <br />P.O. Box 1115 <br />La Porte, Texas 77572-1115 <br />Re: West Coupland Street <br />Uretek Job #: 100284 <br />Dear Mr. Thompson: <br />We propose to underseal and lift West Coupland Street per the Profile <br />Drawings, Sheet 1 through 6. <br />Estimated Cost: <br />Inside Curb 4,122 lbs. URETEK 486 @ $5.00 per lb. $ 20,610.00 <br />Outside Curb 5,895 lbs. " " " @ $5.00 per lb. 29,475.00 <br />Center 11,019 lbs. " " " @ $5.00 per lb. 55,095.00 <br />$105,180.00 <br />We offer for your consideration an alternate. The alternate lift elevation <br />is for the center of the street as shown on Drawing 5 and 6. <br />Alternate Cost: <br />Inside Curb 4,122 lbs. URETEK 486 @ $5.00 per lb. $ 20,610.00 <br />Outside Curb 5,895 lbs. " " " @ $5.00 per lb. 29,475.00 <br />Center 8,175 lbs. " " " @ $5.00 per lb. 40,875.00 <br />$ 90,960.00 <br />We anticipate the Base Bid work to be complete in 7 working days. The <br />Alternate Bid will take 6 working days. <br />This estimate is quoted per the URETEK Service Contract, which is submitted <br />herewith. <br />We look forward to a pleasant and lasting relationship and thank you for your <br />trust. <br />Sincerely, _ <br />Carl A. Ferm <br />Executive Vice President <br />Enclosures: Service Contract <br />2 Sets of Profile Drawings <br />9422 Hammerly • Houston, Texas 77080 • Tel: 713/973-0125 • Fax: 713/973-2168 <br />