My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1999-02-22 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1990's
>
1999
>
1999-02-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:11 PM
Creation date
3/21/2025 1:55:07 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
2/22/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />..' <br /> <br />e <br /> <br />Information for Offerors <br />Page 2 <br /> <br />6. LAWS AND REGULATIONS <br /> <br />The offerer's attention is directed to the fad that all applicable state laws, municipal <br />ordinances, and the rules and regulations of all authorities having jurisdiction over <br />construction of the project shall apply to the contrad throughout, and they will be <br />deemed to be induded in the contrad the same as though herein written out in full. <br /> <br />7. METHOD OF AWARD - BEST aUALlRED OFFEROR <br /> <br />The best proposal submitted by a responsible offeror will be negotiated with City of <br />La Porte. If the proposal is accepted by the City, and the proposal does not exceed <br />the amount of funds then estimated by the Owner as available to finance the <br />contrad, the contrad will be awarded. If such proposal exceeds such amount,' the <br />Owner may reject all proposals or may award the contrad on a negotiated proposal <br />combined with such dedudible alternates applied in numerical order in which they <br />are listed in the Form of Proposal, as produces a net amount which is within the <br />available funds. <br /> <br />Criteria for selection of best proposal will be included in the specifications of each <br />proposal. <br /> <br />8. OBLIGATION OF OFFEROR <br /> <br />At the time of the opening of proposals, each offeror will be presumed to be <br />thoroughly familiar with the scope of work. The failure or omission of any offeror to <br />examine any form, instrument, or document shall in no way relieve any offeror from <br />any obligation in respect of his proposal. .. <br /> <br />9. SAFETY STANDARDS AND ACCIDENT PREVENTION <br /> <br />With resped to all work performed under this contrad, the Contrador shall: <br /> <br />(1) Comply with the safety standards provisions of applicable <br />laws, building and construdion codes and the "Manual of <br />Accident Prevention in Construction" published by the <br />Associated General Contradors of America, and the <br />requirements of the OcaJpational Safety and Health Ad of <br />1970 (Public Law 91-596) <br />
The URL can be used to link to this page
Your browser does not support the video tag.