My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002-07-15 Special Called Regular Meeting and Workshop Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
2000's
>
2002
>
2002-07-15 Special Called Regular Meeting and Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:17 PM
Creation date
3/21/2025 2:01:27 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/15/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ~ <br />The <br />Welch <br />C0"'Pa"y Risk Evaluation and Manaaement <br />-- Part one of six components of a Model for Health Plan Review <br />We believe in using a six step approach to a benefit plan consulting <br />engagement. <br />-- The first step, Risk Evaluation and Management, uses a "wide angle lens" <br />to view how all benefit programs sponsored by a district fit into the group as <br />a whole. Often, the benefit package make-up is a result of past programs. <br />The "we've always done it this way" mentality is weighed against market <br />factors to be sure the current programs squeeze the most out of the benefit <br />dollar while meeting the needs of the employees. <br />While most effort in this area is concentrated on the medical plan, other <br />healthcare coverages such as dental and vision can benefit from this <br />investigation. <br />-~ Included in Risk Evaluation and Management are the following disciplines: <br />~ Industry Age, Cost, and Risk Assessment <br />- Industry Utilization Graphing <br />Optimum Provider Utilization <br />- Needs versus Health Assessment <br />Sites of Care Evaluation <br />- Demand Management <br />The result of this first evaluation will provide the consultant with a priority list <br />of projects within the benefit categories, as well as a measure of <br />expectation and outcome from the investigation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.